|
School Construction Video January 2008 |
|
|
|
|
The above video is a short clip compiled at the CLC of the new school being built. The footage was taken between 10th October 2007 and 25th January 2008.
The above video is a short clip compiled at the CLC of the new school being built. The footage was taken between January 2008 and July 2008.
The above video is a short clip compiled at the CLC of the topping out ceremony
|